Our expertise
The engineering behind a charging network that keeps working.
Charging infrastructure is an electrical project, a construction project and a software platform at once. Our team covers all three, which is why the finished asset behaves as expected.
Electrical engineering
01Distribution design, protection and discrimination, earthing and PEN fault protection, load management and testing. Charging adds significant load to a site, and the design has to reflect what the existing installation can safely carry.
- Capacity and demand assessment
- Protection and discrimination studies
- Load management design
- Testing and certification
Grid connection & DNO liaison
02The connection is usually the critical path. We prepare the application, respond to the network operator and coordinate with the ICP so the programme reflects the real position rather than an optimistic one.
- Capacity applications
- DNO and ICP coordination
- Connection programme planning
- Substation and infrastructure scoping
Civil engineering & construction
03Foundations, ducting, containment, drainage reinstatement, bay markings and accessibility. A charging bay has to work for the driver, the vehicle and the maintenance engineer.
- Groundworks and foundations
- Ducting and containment
- Bay layout and markings
- PAS 1899 accessibility considerations
Software & payments
04Charge point management, OCPP integration, tariffs, access control, contactless payment and roaming. The platform is how the site owner keeps control of who charges and what it costs.
- OCPP onboarding and configuration
- Tariff and access rules
- Contactless and app payment
- Reporting and data export
Network operations
05Monitoring, alarm triage, remote diagnostics, engineer dispatch and driver support. Faults are found by the platform, not by a complaint at reception.
- 24/7 monitoring
- Remote diagnostics
- Engineer attendance
- Availability reporting
Commercial & project management
06Feasibility, business case support, procurement documentation, programme management and handover. Public sector clients in particular need a paper trail that stands up to scrutiny.
- Feasibility and option appraisal
- Tender-ready specifications
- Programme and risk management
- Handover documentation
Design principles
Four decisions that determine whole-life cost.
Design for the load you will actually have
Oversizing is as poor an outcome as undersizing. We model realistic demand and build in sensible headroom.
Keep the driver's experience in view
Bay layout, cable reach, signage and payment decide whether a charger gets used, not just its power rating.
Document everything
As-built drawings, test certificates, asset registers and configuration records. Maintenance depends on them.
Make it serviceable
Access for engineers, replaceable components and clear isolation points keep whole-life costs down.
Technical questions
Have your engineer speak to ours.
If you are working through a design, a capacity question or a specification, we are happy to have the technical conversation before there is a commercial one.