Skip to content

Frequently asked questions

The questions we actually get asked.

Grouped by the point in the process they usually come up. If yours is not here, ask it directly and we will answer.

Commercial

Who maintains the charge points after installation?

We do, where we operate the site. That covers monitoring, remote diagnostics, engineer attendance, periodic electrical inspection and testing, and a service record per unit. Estates we did not install can also be surveyed and taken on for maintenance where the equipment is serviceable.

What happens if a charge point fails?

The management platform raises an alarm and the fault is triaged remotely. Where it cannot be cleared, an engineer attendance is scheduled and the site contact is notified with a reference. Availability and response performance are reported to the site owner.

Technical

Do we need to upgrade our electricity supply?

Sometimes, but not always. Dynamic load management shares the capacity you already have across charge points, which often avoids an upgrade entirely. A capacity assessment establishes what is available and what a larger connection would involve.

What is the difference between AC and DC charging?

AC charging is slower, typically 7kW to 22kW, and suits vehicles parked for a few hours or overnight. DC rapid charging starts around 50kW and is for drivers who need to be moving again in twenty to forty minutes. Dwell time, not headline power, should decide which you need.

Public sector

Do you work with local authorities?

Yes. We deliver public charging on council land, including concession-based arrangements, and we provide the documentation procurement teams need for business cases and tender responses. Specific contract terms are only published where the authority has approved them.

Can you take over an existing charging network?

Often. Transition work begins with an audit of the installed estate, payment arrangements, back-office contracts and maintenance obligations. Where the equipment supports OCPP it can usually be onboarded to our management platform.

Cost & funding

How much does commercial EV charging installation cost?

There is no reliable price per bay without a site survey. The largest variable is usually the electrical connection, followed by equipment, civil works and installation. Two sites with the same number of bays can differ substantially because their available capacity is different. We set out the cost drivers for your site before any design work is committed.

Do we have to pay for the infrastructure ourselves?

Not necessarily. Customer-funded, operator-funded, concession and grant-supported models all exist. Which one is appropriate depends on the site, the projected use and who you want to hold the asset. Operator-funded arrangements are only available where the site's projected utilisation supports the investment.

Is a price per bay available on request?

We can give an indicative range once we understand the site type, the number of bays and the existing supply. A fixed figure before a capacity assessment would not be reliable, so we do not publish one.

Are grant schemes available for charging infrastructure?

Schemes open and close, and eligibility rules change. We will tell you which current routes may apply to your site type and what evidence an application needs, but we do not publish grant amounts or promise eligibility.

Drivers

How do drivers pay for charging?

Public charge points accept contactless card payment, with app and RFID options where offered. Card details are handled by the payment provider. Drivers who need help should contact driver support rather than the site reception.

Process

How long does a commercial installation take?

A straightforward installation can be completed in a few weeks once the design and supply are confirmed. Where a new or upgraded grid connection is required, the network operator application is usually the critical path and can add several months. We set the programme out after the capacity position is known.

What does an indicative site assessment mean?

It is an assessment based on the information available and a site survey. It is not a confirmed technical feasibility decision. Confirmed capacity depends on the network operator's formal response and detailed design.

How is our enquiry data used?

Your enquiry is stored in our website system and used to respond to you and assess the site. It is then transferred to our internal CRM where a commercial conversation follows. Marketing emails are only sent if you tick the separate optional box.

Still deciding?

Ask the question you are actually worried about.

Cost, disruption, timescales, what happens if a charger fails. Those are the real questions, and we answer them plainly.