High-power charging where drivers need it

Rapid & ultra-rapid charging

Rapid and ultra-rapid charging delivered as a complete project, including power, civils, commissioning and operation.

Rapid charging is an infrastructure project before it is a charging project. The outcome depends on the power available, the cost of getting it to site, and whether the layout lets a driver arrive, plug in and leave without manoeuvring problems.

EV Smart manages the whole route to energisation: capacity assessment, DNO application, civil and electrical works, commissioning and then operation, including contactless payment and remote monitoring.

What we deliver

  • Power capacity assessment and DNO application management
  • Ultra-rapid DC hub design and bay layout
  • Civils, ducting, foundations and lighting coordination
  • Contactless payment and roaming configuration
  • Commissioning, load testing and handover documentation
  • 24/7 monitoring with remote diagnostics

How delivery works

  1. 01Site survey and capacity review
  2. 02Design, specification and programme
  3. 03Grid application and civil works
  4. 04Installation and commissioning
  5. 05Software, tariffs and payments
  6. 06Ongoing operation and maintenance

ChargePointPro for rapid hubs

Hub decisions hinge on constraints and demand. Both are modelled.

Rapid and ultra-rapid hubs carry the highest capital exposure of any charging project. ChargePointPro supports site identification against traffic and coverage, an early view of grid constraints, demand modelling and investment appraisal. After delivery, the same platform monitors utilisation and operational performance, which is what determines whether a second phase is justified.

  • Site identification against traffic flows and coverage
  • Early grid constraint assessment ahead of a DNO application
  • Demand modelling and investment appraisal
  • Operational performance monitoring after commissioning

Common questions

How long does a rapid charging site take?

A straightforward site can be energised in a few months; a site requiring a new DNO connection can take considerably longer. The grid application is usually the critical path, which is why it is started first.

What power do ultra-rapid chargers need?

Ultra-rapid units typically require a high-capacity three-phase supply, often with a dedicated substation. Site-specific capacity is confirmed through a DNO application.

Delivery assurance

Coordinated specialists, credentials checked.

Infrastructure work is delivered by qualified specialists under our coordination: electrical contractors, civil engineering and groundworks, highway electrical and grid connection partners. Each is appointed only for the scope its accreditations and insurance cover, and every credential is recorded against the legal entity that holds it.

Next step

Tell us about your site.

Send us the location and what you are trying to achieve. We will come back with an honest view of what is possible, what it involves and what it is likely to cost.