Cost, funding & commercial models
What it costs, and who pays for it.
Upfront cost is the thing that stops most projects. It is also genuinely variable, so this page explains what drives the number and the routes that avoid a large capital outlay.
What drives the cost
There is no sensible price per bay without a site survey.
Two car parks with the same number of bays can differ by a factor of five on cost, because the electrical connection is different. These are the elements that make up the number.
The electrical connection
Usually the largest variable. If the site's supply cannot carry the load, a new or upgraded connection drives both cost and programme.
The equipment
AC workplace units are modest per bay. DC rapid units are a different order of magnitude, particularly above 100kW.
Civil and groundworks
Foundations, ducting, reinstatement, bay markings and lighting. Often underestimated on older car parks.
Installation and commissioning
Containment, cabling, protection, testing and configuration. Certified work, not a plug-in job.
Software and payment
Management platform, tariffs, card payment and roaming. Usually ongoing rather than one-off.
Operation and maintenance
Monitoring, support, repairs and periodic inspection across the life of the asset.
Ways to fund it
Six routes, and the situations they suit.
Customer funded
You fund the infrastructure and own it. Predictable, and the asset sits on your balance sheet.
Best where the site is strategic and long-term control matters.
Operator funded
EV Smart funds and operates the infrastructure under a long-term agreement. No capital outlay from you.
Best where projected utilisation supports the investment and the site is a long-term holding.
Concession
A defined operating concession, common with councils: performance obligations, reporting and a term.
Best for public estates that need a partner without capital pressure.
Grant supported
Where a relevant fund is open, grant support can reduce the capital required. Eligibility rules change.
Best applied early, before specification is fixed.
Phased delivery
Install the capacity and containment now, add charge points as demand grows.
Best where demand is uncertain but the site is expected to grow.
Revenue share
A commercial arrangement where income is shared against actual charging activity.
Best where the landowner wants upside rather than a fixed rent.
Grants
Grant schemes change. Check before you specify.
Grant funding for charging infrastructure has moved several times since 2020, and current schemes have specific eligibility, technical and reporting requirements. We will not publish figures or claim eligibility on this page, because a stale claim is worse than no claim.
What we can do is tell you which schemes are relevant to your site type, what evidence an application needs, and how to avoid specifying equipment that fails the criteria. Grant support is applied for before the specification is fixed.
- Confirm what the site's existing supply can actually deliver
- Establish whether a supply upgrade is needed, and its likely timescale
- Check whether any grant scheme is open, and its current eligibility rules
- Compare whole-life cost, not just the installation quote
- Agree who owns the equipment and what happens at end of term
- Confirm the maintenance and response obligations in writing
Straight answer
If capital is the constraint, say so at the start. It changes which model we assess first, and it is better raised before a design is developed than after.
Request a proposalCost question
Ask us what your site would actually involve.
Send the postcode and the number of bays you have in mind. We will tell you what the main cost drivers are likely to be before you commit to a survey.