Charging that keeps your business moving
Workplace EV charging
Staff and visitor charging designed around shift patterns, parking pressure and real electrical capacity.
Workplace charging is rarely a question of fitting the most sockets. It is a question of how many vehicles need to be charged, over what window, and what the existing supply can support. We start with a load study, then design a solution that fits the site rather than the brochure.
Charging can be allocated to staff, shared fairly across a pool, or reimbursed through the management platform, so the commercial and HR arrangements are agreed before installation rather than after.
What we deliver
- Dynamic load management to avoid supply upgrades
- Staff, visitor and pool-vehicle access profiles
- Energy reporting and cost reimbursement
- Future-proofed containment and ducting for expansion
- OZEV grant-aware specification and documentation
- Commissioning, handover and user guidance
How delivery works
- 01Site survey and capacity review
- 02Design, specification and programme
- 03Grid application and civil works
- 04Installation and commissioning
- 05Software, tariffs and payments
- 06Ongoing operation and maintenance
ChargePointPro for workplaces
Technical assessment first, reporting afterwards.
Workplace charging usually starts with a capacity question and ends with a question about who is using it. ChargePointPro supports the technical assessment at the outset, then provides usage reporting by charger and by period, with fault and availability records that support maintenance planning rather than ad hoc call-outs.
- Technical and capacity assessment before specification
- Commercial modelling for staff and visitor tariffs
- Charger management and access arrangements
- Usage reporting and planned maintenance evidence
Common questions
How many charge points does a workplace need?
A useful starting point is the number of staff who currently drive electric vehicles, plus a growth allowance, weighted by how long vehicles are parked. A load study then confirms what the supply can support.
Can we add charging without upgrading the electricity supply?
In many cases yes. Dynamic load management shares the available capacity across charge points, which often avoids a costly supply upgrade.
Next step
Tell us about your site.
Send us the location and what you are trying to achieve. We will come back with an honest view of what is possible, what it involves and what it is likely to cost.
