Technology · ChargePointPro
ChargePointPro — Intelligence Behind Every Charging Decision.
From screening a location and reading the ground and grid behind it, to modelling commercial returns, diagnosing faults before they become outages and reporting on live network performance.
ChargePointPro is EV Smart's internally developed infrastructure intelligence and operational management platform.
It brings together geographic intelligence, commercial modelling, charging network data, operational performance and management reporting.
Developed around EV Smart's practical experience delivering and operating EV charging infrastructure, ChargePointPro helps our team plan more intelligently, make better-informed decisions and provide clearer information to our commercial partners.
Alongside site and commercial intelligence, the platform holds ground and infrastructure intelligence (mapped geology, borehole records, mining risk screening, satellite ground-motion measurements and published network information) and AI-assisted diagnostics that analyse OCPP fault records and operating history to produce downtime risk indicators and maintenance recommendations.
How this fits together
The platform is used alongside our underlying charge point management systems. It is an internal EV Smart platform, used in the work we deliver for clients. It is not offered as a separate public software product.
Infrastructure delivery, charge point operation and data intelligence sit in one business. That is the difference between a forecast and a forecast you can later check against the record.
How we operate networksThe lifecycle
One platform across the whole infrastructure lifecycle.
ChargePointPro supports decisions from the first desktop screening through to the reporting issued years later. Select a stage to see what the platform contributes at that point.
Stage 01
Identify
Geographic intelligence and location opportunities.
Desktop screening of postcodes, existing charging coverage, competitor locations and likely demand, so effort goes into sites with a plausible case rather than a long list.
The network record
The numbers behind the platform.
ChargePointPro supplies the data intelligence behind EV Smart's network reporting. These totals are read from the platform's own network record and refreshed automatically, never typed in: network locations, installed units, the EVSEs inside them, the AC and DC split, completed sessions and energy delivered.
Network locations
75+
Across our charging network
Physical charge points
307
Commissioned charge point units: the cabinets and pedestals themselves. One unit can contain several EVSEs.
EVSEs
500+
Across our managed network
Connectors
508
Physical connectors across all EVSEs. Normally equal to the EVSE count; a higher number means some EVSEs carry more than one socket.
AC EVSEs
489
EVSEs delivering alternating current, for longer stays and overnight charging.
DC EVSEs
18
EVSEs delivering direct current: the rapid chargers in the network.
Lifetime charging sessions
115,000+
Successfully completed
Lifetime energy delivered
2.2million+kWh
Delivered to drivers across the network
Energy delivered, last 30 days
77MWh
Electricity delivered by completed sessions across the previous 30 whole days.
Data last updated 19 November 2026 at 01:19 (UK time)
How we operate networksThese figures count commissioned infrastructure, not equipment available for charging at this moment. Units awaiting repair or otherwise temporarily unavailable are included in the totals.
Charging sessions and energy delivered are cumulative lifetime totals for the network since records began, not annual figures.
- 23 commissioned unit(s) are currently long-term unavailable. They are inside the network totals because they remain part of the commissioned network.
- 4 unit(s) are excluded from every published total: documented trial equipment and units never connected to the network.
Capabilities
Eight things the platform does, and what each one does not do.
Every section below states the limits of the capability as well as the function, because a site assessment is not a survey, a screening is not an investigation and a risk indicator is not a guarantee.
Capability 1
Find the Right Location Before Making the Investment.
EV Smart uses geographic intelligence to assess potential EV charging locations before capital is committed to a site.
Lifecycle stage 01
Site selection is where most of a project's commercial outcome is decided. ChargePointPro brings the factors that shape a location into one assessment: where vehicles already stop, what charging already exists nearby, how much demand the area can realistically support and what the site itself can accommodate.
Assessment factors can be weighted to suit the opportunity, whether that is a public network gap, a workplace car park or a fleet depot where vehicles return to base.
- Geographic site assessment
- Postcode-based location analysis
- Existing charging infrastructure
- Competitor charging locations
- Local demand and coverage considerations
- Site suitability scoring
- Customisable assessment factors
- Infrastructure and grid information
- Opportunity identification
- Shortlisting and feasibility workflows
What this is not
A ChargePointPro assessment is a desktop study based on available data. It is not a site survey, a DNO capacity confirmation or an investment approval. Those are separate steps with their own evidence and sign-off.
Capability 2
Understand the Ground and the Grid Behind a Site.
ChargePointPro brings mapped geology, borehole records, mining risk screening, satellite ground-motion measurements and published network information into the same site assessment.
Lifecycle stage 02
Civil works are where an EV charging budget most often moves, and ground conditions are usually the reason. ChargePointPro reads the site before anything is priced: British Geological Survey mapped geology, BGS borehole index records, published mining risk screening and Copernicus EGMS satellite ground-motion measurements derived from InSAR, held as overlays against the assessment.
Ground evidence gathered for a site is interpreted alongside that mapped picture, and AI-assisted analysis produces a preliminary view of ground integrity that our engineers work from when planning civils, foundations and cable routes. The same assessment layer holds published Northern Powergrid substation and network-area information, so the likely connection route and the constraints around it are visible while the site is being judged, not after a design has been fixed.
- British Geological Survey mapped geology
- BGS borehole index information
- Published mining risk screening
- Satellite ground-motion measurement (Copernicus EGMS, InSAR)
- Ground evidence interpretation
- AI-assisted preliminary ground integrity analysis
- Site-specific ground assessment interfaces
- Published Northern Powergrid substation and network-area information
- Infrastructure and network overlays
- Grid feasibility screening
- Ground and grid factors carried into the commercial model
Screening, not a survey
Ground and grid intelligence is advisory screening. Satellite ground-motion coverage is limited to the datasets loaded into the platform and is not complete or nationwide. Published network information shows what exists on the network; it does not confirm connection capacity, which requires a formal DNO application. Ground integrity analysis informs design and budget and does not replace a geotechnical investigation, a utility search or an engineer's site assessment.
Capability 3
Understand the Commercial Opportunity Before Committing Capital.
ChargePointPro models the cost and return position of a proposed site so commercial decisions are evidence-led rather than assumed.
Lifecycle stage 03
The platform brings installation and infrastructure costs together with modelled charging demand, utilisation assumptions, energy costs and operating expenditure. Those inputs produce indicative projections and the scenarios behind them.
Because the assumptions are explicit, a partner or board can see which part of the case is most sensitive: a change in utilisation, tariffs or energy cost changes the answer, and that is visible before a contract is signed.
- Installation and infrastructure costs
- Capital expenditure
- Operating expenditure
- Estimated charging demand
- Utilisation assumptions
- Revenue projections
- Electricity costs
- Maintenance expenditure
- Commercial partner arrangements
- Indicative investment returns
- Financial sensitivity analysis
- Long-term project forecasts
- Portfolio-level investment considerations
What this is not
All figures are indicative projections based on stated assumptions. They are not guaranteed returns, and outcomes depend on actual usage, tariffs, energy prices and site conditions. Commercial terms are agreed per project and are not published here.
Capability 4
Know How Your Charging Network Is Performing.
ChargePointPro analyses what the network is actually doing, session by session, rather than relying on assumptions made at design stage.
Lifecycle stage 06
Charging session data, energy consumption and availability are reviewed at network, location, charger and connector level. Over time that shows which sites are performing, which are drifting and where a reliability problem is recurring.
Live information comes from the charge point management systems operating the units; regularly synchronised views support day-to-day operations, and historical records support comparison across periods.
- Charging session analysis
- Electricity consumption
- Charging utilisation
- Network and location performance
- Connector and charger performance
- Revenue trends
- Historical comparisons
- Downtime analysis
- Reliability information
- Operational KPIs
- Performance anomalies
- Underperforming locations
Data timing
Operational figures are drawn from connected charge points and the management systems that run them. Live values depend on the reporting interval of each unit and network connection; historical comparisons depend on the completeness of the record. Figures shown on this page are illustrative, not site data.
Capability 5
Faults Analysed Faster. Maintenance Planned on Evidence.
ChargePointPro applies AI-assisted analysis to OCPP fault records, asset history and operating data, producing diagnostic findings, downtime risk indicators and maintenance recommendations for our engineers to act on.
Lifecycle stage 07
When a charger fails, the error code is only part of the answer. ChargePointPro runs AI-assisted analysis across OCPP fault records and the operating history held for a unit, its site and its connectors, alongside network intelligence analysis of site, partner and network performance, so an engineer starts from a diagnosis rather than a raw log.
Downtime risk assessment and maintenance needs analysis run against the same historical record, flagging the chargers and sites where the pattern suggests intervention is likely to be needed, and ranking where attention is best spent. The result is prioritisation: planned maintenance instead of pure reaction, and fewer repeat visits to the same fault.
- AI-assisted OCPP fault diagnosis
- AI-assisted network, partner and site performance analysis
- Data-led downtime risk assessment
- Maintenance needs analysis from operating history
- Repeat-fault and pattern detection
- Risk indicators by charger, connector and site
- Maintenance prioritisation and recommendations
- Diagnostic findings recorded against the asset record
- Historical fault data retained for trend review
- Engineer review before any intervention
What this is not
Risk indicators are produced from the historical record available for each asset and site. They estimate likelihood and priority; they do not guarantee that a failure will or will not happen, and they do not prevent downtime. Every recommendation is reviewed by our engineers, and nothing on this page is a reliability, uptime or response-time guarantee.
Capability 6
Clear Reporting. Better Visibility. Stronger Partnerships.
ChargePointPro produces reporting for landowners, councils and commercial partners, built on the same operating data that runs the network.
Lifecycle stage 08
Revenue-share and concession arrangements only work when both sides can see the same numbers. Reporting covers usage, energy delivered, sessions, availability and commercial performance for an agreed period, at the level a partner needs.
Reporting is issued as structured summaries for the agreed reporting period. Direct self-service dashboard access is provided only where that is part of the arranged service; otherwise reports are shared with the partner by the EV Smart team.
- Monthly usage trends
- Electricity delivered
- Charging sessions
- Revenue performance
- Partner commercial reporting
- Revenue-sharing calculations
- Individual site performance
- Portfolio comparisons
- Usage growth
- Reporting periods and trends
- Operational availability
- Relevant maintenance metrics
- Structured performance summaries
Access arrangements
Reporting scope, frequency and access method are set out in each partnership agreement. Not every partner receives a live dashboard login; the standard route is a periodic report provided by EV Smart.
Capability 7
From Reactive Maintenance to Better-Informed Network Management.
ChargePointPro keeps the asset record, fault history and maintenance activity together, so reliability decisions are based on evidence.
Lifecycle stage 05
Chargers are tracked as assets: site, unit, connector, install date, warranty position and service history. Faults and downtime are recorded against those assets, which makes recurring problems and repeat visits visible instead of anecdotal.
That evidence supports prioritisation: which site needs attention first, whether a fault is a pattern or a one-off, and whether replacement is more sound than repair.
- Charger asset management
- Network status and fault visibility
- Downtime investigation
- Recurring fault analysis
- OCPP diagnostic information
- Maintenance history
- Planned maintenance
- Support tickets
- Service response tracking
- Operational performance trends
- Engineering workflows
Scope
Asset, fault and maintenance records describe what has happened on the sites we operate or have delivered. Downtime risk indicators and diagnostic analysis are covered in the AI-assisted diagnostics section; neither replaces a site visit or an engineer's judgement.
Capability 8
See the Bigger Picture Across Your Charging Infrastructure.
ChargePointPro works at portfolio level as well as site level, so a network can be managed as an investment rather than a set of individual chargers.
Lifecycle stage 07
Comparing sites and periods shows where the network is growing, where it is stalling and where additional capacity or a different tariff would pay back. The same evidence supports procurement and funding cases, where a record of delivered performance carries more weight than a projection.
For a council, landlord or fleet with several sites, that comparison is what turns individual installations into a planned network.
- Multi-site portfolio comparisons
- Site and network performance trends
- Commercial performance
- Opportunity identification
- Investment prioritisation
- Long-term network planning
- Project progress
- Structured reporting for decision-makers
- Procurement and public sector evidence
- Historical performance analysis
Scope
Portfolio analysis covers sites EV Smart operates or has delivered, using the records held for those sites. Comparative benchmarks across third-party networks are limited to publicly available coverage information.
Inside the platform
What the platform holds, and how it is presented.
Site screening, assessment factors, forecast models, network dashboards, utilisation trends, partner reports, asset monitoring and portfolio comparison. Published screenshots are redacted and approved by EV Smart; anything not yet approved is shown as a layout representation.
Layout representations — approved screenshots pending
Site suitability
IllustrativeSite A
82/100
Site B
71/100
Site C
54/100
Site suitability map
Postcode-level screening with candidate sites scored against coverage, demand and competitor proximity.
Assessment breakdown
IllustrativeCoverage gap
86
Demand indicators
74
Grid proximity
58
Access and layout
69
Competitor density
41
Site assessment breakdown
The factors behind a suitability score, weighted for the opportunity type.
Forecast model
IllustrativeCapex
Indexed
Sensitivity
3 scenarios
Financial forecasting dashboard
Indicative capital and operating cost against modelled demand, with sensitivity scenarios.
Network overview
IllustrativeSites
—
Sessions
—
Energy
—
Availability
—
Values withheld — no operating data shown
Network performance dashboard
Sessions, energy delivered and availability across an operating network.
Utilisation trend
IllustrativeIndexed shape only
Utilisation trends
Utilisation by month and by location, for comparison across reporting periods.
Partner report
IllustrativeMetric Period 1 Period 2 Sessions Redacted Redacted Energy delivered Redacted Redacted Uptime 98.x% 99.x% Revenue share Per agreement Per agreement Layout example — figures never published
Partner monthly reporting
The structured summary issued to a landowner or authority for an agreed period.
Asset status
Illustrative- CP-01Available
- CP-02Charging
- CP-03Fault logged
- CP-04Planned service
Status examples — unit references withheld
Asset and maintenance monitoring
Charger status, fault history and maintenance activity held against the asset record.
Portfolio comparison
IllustrativeRetail park
index 78
Depot
index 63
Leisure
index 47
Council car park
index 39
Hotel
index 26
Relative shape by site type, not actual figures
Portfolio comparison
Multiple sites compared on utilisation, availability and commercial performance.
The panels above are illustrative representations of how information is presented in ChargePointPro. They are not screenshots and contain no operating data, customer details, financial assumptions or partner terms. Real screenshots are published only where EV Smart has approved a redacted version.
Why our technology matters
The outcome, in plain terms.
Technology is only worth having if it changes a decision. These are the decisions it is used for.
Better-informed site selection
Screening happens against data before anyone commissions a survey or commits to a location.
Constraints considered earlier
Capacity, access and coverage questions surface at assessment stage, not after a design has been priced.
Stronger commercial assessment
Cost, demand and sensitivity sit in one model, so a case can be challenged before it is approved.
More transparent partner relationships
Partners see usage, energy and revenue performance on the same basis our team works from.
Greater visibility over performance
Utilisation, availability and downtime are reviewed as routine reporting rather than one-off exercises.
Better maintenance planning
Fault history and asset records support planned intervention instead of repeated reactive visits.
More useful operational reporting
Reports are structured for the audience: an authority committee, a landowner or an internal board.
Evidence-led long-term decisions
Historical performance informs when to expand, reprice or replace, with the record to support it.
Next step
Four ways to take this further.
Each route goes to the same secure enquiry process used across this site, so the details reach our commercial team and our systems directly.
- Request assessment
Request an Infrastructure Assessment
A site-specific assessment covering suitability, capacity and the realistic commercial routes.
- Submit a site
Submit a Potential Charging Site
Send us a location you own or control. We will screen it before anyone spends money on a survey.
- Start a conversation
Discuss a Commercial Project
For multi-site programmes, concessions or partnership structures that need a commercial view.
- Request a walkthrough
Request a ChargePointPro Demonstration
A walkthrough of how the platform is used on a live project, with client data redacted.
Talk to us
Bring us a site, a portfolio or a problem.
We will tell you what the data shows, what it does not, and what we would need to find out before a decision.
