Charging technology
What makes a site suitable for an ultra-rapid charging hub?
28 October 2026 · 6 min read · EV Smart
Power, access, dwell and competition: the four tests a site has to pass before an ultra-rapid hub makes commercial sense.
1. It has to have the power, or a realistic route to it
Ultra-rapid hubs need serious capacity. Four 150kW bays running together can demand more than most commercial sites will ever have available. In practice that means a dedicated substation or a nearby high-voltage connection, and a network operator application that can take months.
This is why hub projects are decided on the grid position first. A perfect site without power is a slow, expensive project; a plain site with capacity can be energised and earning.
2. Drivers have to be able to get in and out easily
Hub sites live or die on access. Wide bays, room to reverse, no conflict with delivery vehicles, clear signage and lighting that makes the site feel safe at 10pm. A driver who has to manoeuvre around a queue will not come back.
3. The location has to sit on a journey, not just near traffic
Ultra-rapid charging serves people who are already moving: the A-road corridor, the retail park on the way home, the service area on a long trip. Passing trade matters more than footfall in a pedestrianised location, because a rapid stop is fifteen to thirty minutes and needs to fit a journey.
4. The economics need more than one bay
A single rapid unit does not often justify the connection cost. Hubs work because the fixed costs of power and civils are shared across several bays, and because queueing at a single unit is the fastest way to lose custom. Four to eight bays is a more typical starting point where the site can support it.
5. The competition position matters
Before committing, look at what exists within a few miles: power, bay count and reliability. Adding capacity to a location that already has reliable rapid charging is a different proposition from being the first credible hub on a corridor.
What we test first
Our sequence is desk assessment, capacity enquiry, site survey, then indicative layout and programme. If the power is not there and cannot be brought in at a sensible cost, we say so before anyone spends money on design.